Locks, Holds, Notices, or Comments
Your search returned 25 result(s).
Project No.: RGB51606
Description: RES/ROOM ADDITION
Address: 15618 BEAR CREEK DR
City: TPA 33624
Parcel: 016351.0018
Permit Issue Date: 11/26/2019
Permit Status: CONVERTD
L/H/N/C | Text | From | Through |
---|---|---|---|
Comment | INTAKE 03/26/2019 BY TF FILE ROUTED TO ZONING TECH FOR SITE PLAN REVIEW OF SETBACKS AND FLOOD VERIFICATION | 3/26/2019 | 12/31/2020 |
Comment | REC'D (2) FOLDED PLANS | 3/26/2019 | 12/31/2020 |
Comment | ZONING AND FLOOD CONFORMANCE REVIEW IS DENIED by Michelle Wojeck, CFM. Email: WojeckM@HCFLGov.net. The submitted permit application states: Scope of work: Room Addition. The design professional indicates on Sheet: 3; that the proposed addition includes a full Kitchen which appears to create an accessory dwelling unit. This parcel is located within PD76-0166 zoning district and accessory dwelling units are prohibited per the Land Development Code, Section 2.02.02. - Allowable Uses In Zoning Districts. NOTE: This living addition attached to the garage MUST have internal access THROUGH CONDITIONED SPACE into the inside of the main dwelling to be utilized for living space. The applicant is advised to contact a zoning counselor at 813-272-5600 (option 3) for further assistance. | 4/22/2019 | 12/31/2020 |
Comment | Building Plan Review Denied by John Greenland on 05/01/2019 for code compliance. REVISE & RESUBMIT with the following information added to the plans either with details or notes: 1. No information has been provided on connection of new addition to existing building at roof/ wall intersection. Per 903.2 Flashing, "Flashings shall be used to seal roofing systems, where the system is interrupted or terminated and shall be installed in a manner that prevents moisture from entering the wall and roof through joints in copings, through moisture permeable materials and at intersections with parapet walls and other penetrations through the roof plane. Provide detail of flashing as required. 2. Project Documents illustrate existing garage and smoke detectors have been notated in addition; however no Carbon Monoxide Detection has been provided. Provide Carbon Monoxide alarms per R315. File has been routed to RGB Denied Drawer/ File. Revised plans required, all revisions shall be clearly indicated by clouds and a response letter from the person responsible for the design indicating how plan review comments have been addressed shall be submitted with revised drawings. Please contact John Greenland with any questions, email greenlandj@hcflgov.net | 5/1/2019 | 12/31/2020 |
Comment | ZONING/FLOOD AND BLDG CORRECTION SUBMITTED, FILE AND PLANS ROUTED BACK TO MICHELLE WOJECK FOR REVIEW | 8/23/2019 | 12/31/2020 |
Comment | ZONING AND FLOOD CONFORMANCE REVIEW REMAINS DENIED by Michelle Wojeck, CFM. Email: WojeckM@HCFLGov.net. The revised structural drawing is of insufficient detail to demonstrate how the new living addition is accessed THROUGH CONDITIONED SPACE into the inside of the existing dwelling. Please revise the structural drawings to clearly indicate how the proposed lateral addition will have INTERNAL access THROUGH CONDITIONED SPACE into the inside of the existing dwelling. Additionally, it appears that when the project was redesigned to eliminate the accessory dwelling unit the inside of the existing dwelling is being remodeled. This renovation/remodel to the inside of the existing dwelling will require the applicant to demonstrate this scope of work. Permit file has been forwarded to plans examiner, John Greenland. | 8/27/2019 | 12/31/2020 |
Comment | BUILDING Plan Review (RGB - New Living) has been TENTATIVELY approved by John Greenland for building code compliance on 08/28/2019. This permit is pending response to comments by Graphix/ Zoning and therefore a building re-review will be performed with the resubmitted plans which may warrant new comments. Please cloud any plan changes with the resubmittal. Permit File has been routed to RGB Denied Cabinet/ Drawer. | 8/28/2019 | 12/31/2020 |
Comment | Corrections recieved, file routed to graphix (Michelle). | 10/3/2019 | 12/31/2020 |
Comment | Zoning and Flood Conformance review of the correction has been approved by Michelle Wojeck, CFM. The Wall Layout Plan on Sheet 3 of the revised structural drawing demonstrates how the new lateral living addition is accessed through conditioned space into the inside of the existing dwelling. Permit file has been forwarded to plans examiner, John Greenland. | 10/21/2019 | 12/31/2020 |
Comment | BUILDING PLAN REVIEW (RGB - Addition) has been approved by John Greenland for code compliance on 10/22/2019. The permit file has been forwarded to the permit technician for processing. Applicant will be notified by E-mail or Fax when permit is ready for pick up or if any additional information is needed to finish processing. | 10/22/2019 | 12/31/2020 |
Comment | IMPACT FEE ASSESSMENT | 10/28/2019 | 12/31/2020 |
Comment | HOLD FOR SUBCONTRACTOR FORM (ELEC, MECH, PLBG) | 10/28/2019 | 12/31/2020 |
Comment | PERMIT PROCESSED BY FES/ROUTED TO DENIED CABINET/HOLD FOR SUBCONTRACTOR VERIFICATION FORM (ELEC, MECH, PLBG, ROOF)/PERMIT TOTAL $557.33-IMPACT FEE TO BE ASSESSED/APPLICANT NOTIFIED VIA EMAIL | 10/28/2019 | 12/31/2020 |
Notice | TERMITE INSPEC;TION CERTIFICATE | 10/28/2019 | 12/31/2020 |
Notice | REC'D NOC | 10/28/2019 | 12/31/2020 |
Comment | DE MINIMIS FOR ADDITION, NO CHANGE IN MOBILITY | 10/28/2019 | 12/31/2020 |
Comment | RECEIVED ELEC, MECH, PLUMBING, SUBS FORMS HOLDING FOR AUTH AGENT FOR ROOFING CONTRACTOR. APPLICANT NOTIFIED ONSITE. | 11/21/2019 | 12/31/2020 |
Comment | REC'D ROOFING SUB CONTRACTOR FORM HOLDING FOR G.C OR AUTH AGENT TO SIGN THE SUB FORM. HOLDING W/THE FILE | 11/25/2019 | 12/31/2020 |
Comment | ROOFING SUB CONTRACTOR FORM SCANNED INTO OPTIX. | 11/26/2019 | 12/31/2020 |
Comment | PROCESSING COMPLETED 11/26/2019 BY D.GREEN, FILE SENT TO CASHIER FOR PICK UP. APPLICANT WALK IN. | 11/26/2019 | 12/31/2020 |
Comment | REVISION #1 INTAKE 07/17/2020 BY E. WILLIAMS FOR ENERGY CALCS ROUTED TO BLDG (STEVE) FOR REVIEW | 7/17/2020 | 12/31/2020 |
Comment | HOLD FOR REVISION#1 APPROVAL | 7/17/2020 | 12/31/2020 |
Comment | The BUILDING REVISION (Revision #1 energy calc's) has been approved by Stephen Kolaga, on 07/17/2020. The permit file has been forwarded to the permit technician for processing. Applicant will be notified by E-mail when permit is ready for pick up or if any additional information is needed to finish processing. | 7/17/2020 | 12/31/2020 |
Comment | REVISION #1 PROCESSED BY E WILLIAMS HOLDING FOR PAYMENT FEES OF $51.00 . EMAIL RECEIPT TO PERMITTING@HILLSBOROUGHCOUNTY.ORG APPLICANT NOTIFIED BY EMAIL The primary focus for Hillsborough County and the Development Services Department continues to be public safety. In response to COVID-19 coronavirus, we are implementing additional process changes for permit payment and pick up. Fees will now be paid online or via fax with credit cards and pickups will be limited where possible | 7/17/2020 | 12/31/2020 |
Comment | FEES PAID ONLINE , REVISED ENERGY CALCS CAN BE FOUND ON PGM STORE. APPLICANT NOTIFIED BY EMAIL | 7/23/2020 | 12/31/2020 |